Big fan march for the 80th club birthday of VfL Wolfsburg
Traffic obstructions and closures around Berliner Brücke and Allerpark

Roads closed - focus on the Berlin Bridge
The Berlin Bridge is expected to be completely closed from 11:30 a.m. to 2 p.m. - for both private and public transport. Anyone traveling in the city at this time should take a wide detour around the area.
There will be closures at these junctions in the direction of Berliner Brücke:
- Heßlinger Straße → Dieselstraße (right turn towards Berliner Ring remains free)
- Dieselstraße → St. Annen-Knoten/Berliner Brücke (access to Robert-Bosch-Weg remains possible)
- Rothenfelder Straße → Berliner Ring (left turn blocked)
- Berliner Ring → Reislinger Straße (temporary)
- B188 → Berliner Brücke (from Weyhausen and Vorsfelde)
- Wache-Ost traffic circle → Exit closed
- Feeder road from the Autostadt → Berliner Brücke
Parking in Allerpark recommended
Parking spaces P3 to P6 in the Allerpark can still be reached via the B188. The police expressly recommend using these areas or - even better - arriving directly by bus or train. Escape routes will of course remain free.
Autostadt remains accessible on foot
The following applies to visitors to the Autostadt: The area is accessible on foot during the closure period. Anyone arriving by car is asked to use the parking spaces at phaeno or temporarily on the DOW site. The exit from the VW-Tor Ost, Autostadt and Ritz-Carlton area is possible via VW-Mittelstraße and Berliner Ring/Schlosskreuzung.
What we would like to share with you
It is a special day for many people in Wolfsburg - but also a busy one. If you are out and about in the city on Saturday, bring a little patience, arrive early and pay attention to the police's instructions. Together we will ensure that this anniversary can be celebrated safely and happily!